Skyward Tower offers a flexible 36-month installment payment plan with a 25% down payment, quarterly progress milestones, and a 15% settlement upon possession. Inventory pricing begins at PKR 48 Lakh for suites up to PKR 3.90 Crore for duplex sky penthouses, supported by strong capital growth along Bahria Expressway.
Transparent price-per-square-foot metrics, down payment tiers, monthly installment schedules, and cash flow structures for Skyward Tower, Bahria Town Phase 8 Rawalpindi.
1-Bed Luxury Suite Starting Price
Quarterly Construction Milestones
Direct Allocation & Allotment
Key Delivery & Sub-Lease
Forensic pricing breakdown and milestone payments across all unit layouts in Skyward Tower.
| Layout / Unit Designation | Gross Built-Up | Market Valuation Range | Rate / Sq.Ft | 25% Down Payment | Monthly Installment (36 Mo) | 15% Possession Settlement |
|---|---|---|---|---|---|---|
| 1-Bed Luxury Suite | 585 Sq.Ft | PKR 52 Lakh – 65 Lakh | PKR 8,890 – 11,110 | PKR 13.0 Lakh | PKR 86,500 / mo | PKR 7.8 Lakh |
| 2-Bed Deluxe Family Suite | 1,100 Sq.Ft | PKR 94 Lakh – 1.18 Cr | PKR 8,550 – 10,730 | PKR 23.5 Lakh | PKR 156,000 / mo | PKR 14.1 Lakh |
| 3-Bed Executive Residence | 1,750 Sq.Ft | PKR 1.55 Cr – 1.95 Cr | PKR 8,860 – 11,140 | PKR 38.75 Lakh | PKR 258,000 / mo | PKR 23.25 Lakh |
| Skyward Duplex Sky Penthouse | 3,200 Sq.Ft | PKR 3.10 Cr – 3.90 Cr | PKR 9,690 – 12,190 | PKR 77.5 Lakh | PKR 516,000 / mo | PKR 46.5 Lakh |
| Business District Retail Outlets | 350 Sq.Ft | PKR 75 Lakh – 1.60 Cr | PKR 21,400 – 45,700 | PKR 18.75 Lakh | PKR 125,000 / mo | PKR 11.25 Lakh |
| Food Court & Sky Terrace Dining | 450 Sq.Ft | PKR 90 Lakh – 1.80 Cr | PKR 20,000 – 40,000 | PKR 22.5 Lakh | PKR 150,000 / mo | PKR 13.5 Lakh |
Transparent transactional procedures safeguarding buyer capital in Skyward Tower.
Submission of official investor registration forms accompanied by a 25% down payment via bank pay order made directly to the developer's verified project account.
Issuance of a formal allotment letter from the developer citing specific unit number, floor level, gross/net square footage, and linked payment ledger within 14 business days.
Subsequent payments spread across 36 monthly or 12 quarterly installments aligned with verified construction milestones (basement retention, raft casting, and vertical slab progress).
Final 15% handover settlement cleared upon physical keys handover, site walkthrough inspection, utility meter activation, and formal sub-lease documentation.
Detailed accounting of building service charges and resident benefits (PKR 25 / sq.ft).
| Covered Service Component | Operational Standard | Resident Benefit |
|---|---|---|
| 100% Emergency Power (Dual Gensets) | Heavy-duty prime gensets running 24/7 on load shedding | Zero power cuts; runs all elevators, HVAC chillers & lighting |
| Central Climate Control Supply | Central chillers / VRF plant servicing | Maintains uniform building climate and energy efficiency |
| High-Speed Elevator Servicing | OEM monthly maintenance contract with certified technicians | Maximum safety, 99.9% uptime, zero entrapment risk |
| 24/7 Multi-Tier Security & BMS Control | CCTV monitoring, armed guards, RFID boom barriers | Diplomatic standard security for resident families |
| Janitorial & Garbage Management | Twice daily trash collection, automated sanitization | Odorless, five-star hotel hygiene across all floors |
Navigate through verified forensic guides and inventory modules for Skyward Tower.
Main skyscraper directory & floor plans
Master Guide585 Sq.Ft layout configuration
PKR 52 Lakh – 65 Lakh1,100 Sq.Ft layout configuration
PKR 94 Lakh – 1.18 Cr1,750 Sq.Ft layout configuration
PKR 1.55 Cr – 1.95 Cr3,200 Sq.Ft double-height penthouse
PKR 3.10 Cr – 3.90 Cr350 Sq.Ft Ground & 1st floor retail
PKR 75 Lakh – 1.60 Cr450 Sq.Ft 3rd-floor dining space
PKR 90 Lakh – 1.80 CrStatutory approvals & registry dossier
100% ApprovedGross vs net carpet area analysis
Engineering SpecsProjected yields & commercial demand
8.8% – 14.5% ROI